The Bleichert Pendant Tramways: Chapter 7 – Ropeway Construction
Chapter Seven: The timing of the events during removal and reconstruction of the ropeway, can only be obtained through the pages of the newspapers.
The Bleichert Pendant Tramways: Chapter 6 – Rope Saddles
Rope Saddles There were 5 types of rope saddles used on the ropeway, with two different sizes of each for the inbound 25mm Dia. and outbound 33mm Dia. ropes. 1: […]
The Bleichert Pendant Tramways: Chapter 5 – Rope Grip Mystery
The rope grip mystery. I have long puzzled over the reason for the installation of two āCā shaped hooks on every bucket carrier. Fig 5.1 (Red arrow) The reason has […]